Date Reply: 09/13/2016 03:00:00 PM
This serves as official reply of the City Engineers Office regarding the on-line feedback on the absence of street light in Punong Area despite release of millions of funds:
1. The proposed installation of 13 units street lights along boulevard specifically Punong area is covered by the project Construction of Bayawan Coastal Road, Phase 13 with the approved appropriation of PhP 5,000,000.00 funded under EDF 2016
2. Scope of work for the project include billboards & signage, sub-grade preparation, aggregate base course, construction of sidewalk, island, concrete pedestal sidewalk & grouted riprap, Portland Cement Concrete Pavement (length: 150 meters; width: 16.6o meters; thickness: 0.20 meter), electrical and Road Right of Way (RROW) and Drainages.
3. Through fund for the project has earlier been released, public bidding has yet to be conducted on Tuesday, September 13, 2016.
4. Project will start as soon as materials are delivered.
Thank you.
Sincerely,
(Sgd.) ERIC O. TORRES